This project was complete in 18 months. It was a complete HVAC and plumbing renovation. It consisted of (2) 125-ton chillers, 5 Boilers, New blower coils and cabinet heaters. There was an addition of a kitchen suite on the historic 2-story building.
Project Highlights:
- Location: South Bend, Indiana
- Architect: Hebard and Hebard
- Engineer: SCO Engineering
- Total Project Cost: $4.5 million